Monday 5:44am
October 20, 2014
Currently 49°F
Posted: Tuesday, August 20th 2013 at 12:33pm

NGMC installing geothermal field at site of new S. Hall hospital

By Ken Stanford Staff
EMAIL STORY CONTACT EDITOR PRINT
click to enlarge
Geothermal field drilling at Northeast Georgia Medical Center Braselton construction site.
BRASELTON - Work is underway on a geothermal field being installed on the site of the future Northeast Georgia Medical Center (NGMC) in South Hall.

The geothermal well boring subcontractor mobilized on site the first week of June and drilling for over 150 wells began in early July. These 500-foot wells will circulate water to create renewable energy to heat and cool the future hospital.

To learn more about NGMC Braselton and this effort, visit www.nghs.com/braselton or call 770-219-3840.


Link: Northeast Georgia Medical Center/Braselton
Associated Categories: Business News, Local/State News

© Copyright 2014 AccessNorthGa.com
All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.


  • Click here
  • Click here
  • Click here
  • Click here
  • Click here
0.132031
icon
49°F
Gainesville, GA 30501
Clear
Wind: North 0 mph
Dew point: 47°F